Our Work

A look at the infrastructure projects, field work, and jobsite execution behind MG Infrastructure across Texas.

“A man's mind plans his way [as he journeys through life], but the LORD directs his steps and establishes them.” Proverbs 16:9 — Amplified Bible (AMP)

Field-Proven Across Texas

Each project tells the story of our crews, our production, and our commitment to quality on the jobsite. Click any project to see the full photographic journey.

Fiber Placement / HDD

Temple Fiber Expansion

Location: Temple, TX Type: Fiber / Boring

Last-mile fiber optic installation with directional boring for underground route crossings. Multi-phase project covering residential and commercial drops.

View Full Project
📷
Directional Boring

Houston Road Crossing — HDD

Location: Houston, TX Type: HDD

Trenchless horizontal directional drilling for conduit under a major arterial road. Entry pit setup, bore shot, back ream, and conduit pull completed on schedule.

View Full Project
Underground Utility

Central Texas Utility Corridor

Location: Waco / Belton, TX Type: Utility

Duct bank and conduit installation across a commercial development corridor with full documentation, vault installation, and QC support.

View Full Project
📷
Aerial Construction

Houston Aerial Relocation

Location: Channelview, TX Type: Aerial

Relocation of Comcast Aerial Fiber Along Duessen Park in Channelview, Texas. Delash Existing Aerial Plant, build new strand and lash new 96 Count Fiber. This project was in conjunction with Centerpoint Energy setting new Hurricane Resistant Pole, as well raise aerial plant across the Duessen Park Channel for clearance.

View Full Project
📷
Coaxial Splicing

Austin Fiber Splice & Termination

Location: Austin, TX Type: Splicing

Coaxial splicing, fiber splice preparation, and mainline termination for a broadband infrastructure expansion project in the Austin market.

View Full Project
Last Mile Fiber

Killeen Last-Mile Fiber Build

Location: Killeen, TX Type: Fiber

Residential last-mile fiber installation including trenching, conduit, fiber drops, and building entry for a new FTTH (fiber to the home) deployment.

View Full Project

More projects are added continuously as work is completed across Texas.

Partner With MGI

The 12-Stage Project Journey

Every project page on the MGI website follows our 12-stage photographic journey — from site survey through final completed installation. Click any project above to see the full documentation.

Why We Document Every Stage

Photographic documentation of each project stage protects our clients, provides proof of quality, and tells the complete story of the work. Each stage photo includes a description of what was done, why it matters, and how it connects to the next stage.

01

Site Survey

Initial jobsite walkthrough to assess ground conditions, obstacles, utility conflicts, and access points before any work begins.

02

Route Planning

Bore path or trench route is mapped, reviewed for utility conflicts, and approved before equipment is deployed to the site.

03

Utility Marking

811 locate tickets pulled and verified. All known utilities are marked and exposed (potholed) where the bore path crosses them.

04

Trenching

Open trench installation begins where boring is not required. Trench depth and width are maintained per project specifications.

05

Conduit Installation

Conduit runs are installed in the trench or bore path, including innerduct, microduct, or duct bank where specified by the project scope.

06

Fiber Pulling

Mainline fiber optic cable is pulled through the installed conduit. Footage is tracked and production is documented per pull.

07

Fiber Drop to Customer

Last-mile fiber lateral runs are placed from the mainline conduit to each individual home or business on the route.

08

Building Entry

Fiber is brought into the building or structure through a proper entry point, maintaining weatherproofing and code compliance.

09

Splicing

Fiber optic cables are spliced and terminated at the designated splice points. Splice prep documentation is captured at each location.

10

Equipment Installation

Network equipment, pull boxes, hand holes, vaults, and any ancillary hardware are installed and secured per project specifications.

11

Testing

OTDR testing and signal verification confirm the fiber installation meets performance specs from end to end before project closeout.

12

Final Completed Installation

Site cleanup, final as-built documentation, completion photos, and project closeout — delivered cleanly to the client.

Let's Build Something Together

Ready to add your project to our portfolio? Contact MGI and let's talk scope, timeline, and execution.